properties across London and the South of England.
Commercial Gas
Our 3 to 5 star gas servicing, repairs, maintenance and installation packages ensure residents are provided with working boilers gas appliances and ensure they are supplied with heating and hot water at all times. We carry out Planned Preventative Maintenance (PPM) to 150+ commericial sites to ensure compliance with Landlord Gas Safety Testing, L8 Legionella Testing, Electrical Periouducal Testing, F Gas certification and PAT Testing. Our experience is summarised accross social housing, schools, hostpitals, HM prisons, leisure centres and office buildings.
Servicing
Planned Preventative Maintenance
Remedials
Installation
The services we provide include:
- Communal heating and hot water plant rooms
- Communal cold water storage tanks
- Other commercial boiler and ancillary plant (i.e. fans, booster sets, tanks)
- Meter Reading
- Dry Riser maintenance
- Responsive repairs, available 24/7
- Remedials and improvement works, including commercial boiler installation
- BMS servicing, maintenance and installation
- CAFM (Computer Aided Facility Management)
- Communal ventilation systems
- Water testing including quarterly testing of circuits, sampling and annual chlorination
- Lift Maintenance
- Sanitary Services
- Air conditioning plant
- Domestic heat recovery systems
Case Study
The Ledbury Estate, Southwark
As a result of the Grenfell Tower tragedy, a risk assessment was carried out by Southwark and SGN. It was decided that all gas supplies on The Ledbury Estate should be cut off immediately, which left residents without heating/hot water.
The next day ourselves, Southwark and SGN jointly isolated all gas supplies and installed a temporary boiler within 24 hours. We replaced cold water storage tanks, redesigning pipework and installing new hot water cylinders with timed immersion heaters and altered wiring.
A temporary office was set up onsite to provide consistent point of contact for residents. During this 6 week period, there were around 8-10 different S&B teams working on site, putting in around 2,800 manhours overall.